Turkcell MOI Store

DC Panel products were applied on an area of 500 m2 in 2 days in order to meet the urgent needs of Turkcell’s Mall of Istanbul store. Turkcell renovated more than 40 A+ stores using DC Panel’s quick solutions.

  • Category : Store,
  • Year : 2014
  • Location : Başakşehir, İstanbul
  • Length : 500 m2
  • Products Used in Project
    M501 Galita Naturale